🚀 Apply for £10k+ grants with our Startup Launch Kit
shadow shadow shadow shadow shadow
    Country
    Grant Type
    Location
    Who can apply
    Clear

    Electric vehicle chargepoint and infrastructure grants for landlords

    Grants for landlords to install electric vehicle chargepoints and supporting infrastructure in rental and leasehold properties.

    Opening date 1 Apr 2022, 12:01AM

    Closing date 1 Apr 2026, 12:00AM

    There are two grants you can get for installing chargepoints for electric vehicles at a property you own.

    Electric vehicle (EV) chargepoint grant 

    An EV chargepoint grant gives you money off the cost of installing an electric vehicle chargepoint socket. 

    You can get 75% off the cost to buy and install a socket, up to a maximum of ÂŁ350 per socket.

    You can receive up to 200 grants a year for residential properties, and a further 100 for commercial properties.

    Electric vehicle (EV) infrastructure grant

    An EV infrastructure grant gives you money off the cost of wider building and installation work that’s needed to install multiple chargepoint sockets. The work can be for sockets you want to install now and in the future. For example, an EV infrastructure grant can cover things like wiring and posts.You can get 75% off the cost of the work up to a maximum of ÂŁ30,000. The amount depends on how many parking spaces the work covers. 

    You can get:

    • up to ÂŁ350 per chargepoint socket installed

    • up to ÂŁ500 per parking space enabled with supporting infrastructure

    You can receive up to 30 grants each financial year for installing infrastructure in residential carparks.

    You cannot apply for the infrastructure grant if you’re a commercial landlord.

    Mandatory chargepoint or infrastructure requirement

    The grant cannot be given if the installation of the chargepoints and/or infrastructure was a mandatory requirement.  This includes:

    • buildings under construction or being renovated where the Part S Regulations applies on or after 15 June 2022 (for England), for example, for single domestic dwellings with an associated parking space and for non-residential buildings with more than 10 car parking spaces

    • devolved countries where there are similar regulations as for England, for example, the Building (Scotland) Regulations from 5 June 2023

    • where there was a planning application condition mandating the installation of chargepoints and/or infrastructure

    Installers are advised to check with their customers that the proposed installation is not a mandatory requirement.

    Residential landlords

    You can apply for the electric vehicle chargepoint (EV chargepoint) or infrastructure (EV infrastructure) grant if you’re a:

    • landlord with property to let

    • right to manage (RTM) company

    • residents’ management company (RMC)

    • company or person owning the freehold of a property that is let or leased

    • company owning a building’s common areas, including shareholders who are the leaseholders

    • property factor in Scotland

    • private registered provider of social housing (PRP)

    • public sector organisation - for example government departments, local councils, the armed forces or the NHS and emergency services

    • charity that manages or owns residential property

    • registered social housing provider in England or a registered Property Factor in Scotland

    You must be a business either registered at Companies House or VAT registered with HMRC. You must use OZEV approved installers and chargepoints - see the 'How to apply' section of this guide for more information.

    Commercial landlords

    You or the organisation you represent are a commercial landlord if you own or manage property that’s leased or let to a business that pays business rates. You cannot apply for the infrastructure grant if you’re a commercial landlord.You can apply for an electric vehicle chargepoint grant if you’re:

    • an individual with commercial property to let

    • a company that owns the freehold of a commercial property

    • a company that owns a commercial property’s common areas, with shareholders who are the leaseholders

    The chargepoint can only be used by the building’s staff and vehicles. It cannot be used by members of the public. 

    Property requirements

    Your property must be in the UK. You cannot apply for this grant if you live in the Channel Islands or Isle of Man. You can apply for:

    • flats and houses

    • apartment blocks

    • commercial properties

    If you’re letting out a commercial property, the chargepoint can only be used by the building’s staff and vehicles. It cannot be used by members of the public.

    You cannot apply if:

    • you live in the property

    • you only rent your property out as a holiday rental

    • you do not have a company registration number or a VAT registration number

    • you’re installing a chargepoint because of a mandatory requirement

    Your parking space

    Each parking space you’re applying to install a chargepoint at must be:

    • off-street, private and clearly defined - it does not have to be part of the property

    • accessible to your tenant

    • owned by you, or be one you have the legal right to - you may need to provide a Land Registry title register as evidence

    Extra requirements for an EV infrastructure grant

    If you’re applying for an EV infrastructure grant, you must:

    • be using it for a property with multiple homes - for example an apartment block, or estate with buildings that share a car park

    • be installing at least one chargepoint socket as part of the work

    • carry out work on at least 5 parking spaces, so they either have chargepoint sockets or are ready to have them installed in the future

    The aim of the scheme is to accelerate the uptake of electric chargepoints for people living in flats, rental accommodation and apartment blocks, and in commercially let properties.

    Funding is confirmed until 31 March 2025.

    The grant is open. The government reserves the right to end or change this grant scheme. If the grant ends or the grant amount changes, the government will:

    • aim to provide 4 weeks’ notice

    • honour claims made before any public announcement, subject to the grant criteria

    Before you apply you must:

    • complete any necessary upgrades to the building’s electrical supply

    • arrange regular maintenance checks of the chargepoints

    • decide how the electricity and running costs will be paid

    • make sure the chargepoints are accessible

    • update your property’s risk assessment to include the chargepoints

    Apply for the grant

    To apply for the grant you need to:

    1. Create a landlord account on the OZEV grant portal.

    2. Find a chargepoint installer approved by OZEV.

    To create an account on the portal, you will need:    

    • an email address

    • a UK mobile phone to get a security code

    • a Companies House company registration number or a VAT registration number

    If you’re a linked enterprise, you must apply using the company registration number of your controlling company. To start a claim, you should include in your application:

    • one address

    • one installer

    • your installer’s OZEV installer number

    • how many parking spaces the work covers if you’re applying for the electric vehicle infrastructure grant (EV infrastructure grant)

    You must apply for residential and commercial properties separately.

    You can apply for multiple sockets at the same address.

    If you’re using more than one installer or applying for more than one address, submit a separate application for each one.

    You must use an OZEV-authorised chargepoint model.

    Payment of the grant

    After they have completed the work, your installer will complete your claim through the portal. Approved installers have their own access login to the portal.

    They will give details of your chargepoint to OZEV, along with photographs of the installation and an invoice.

    OZEV will email you to ask you to sign into your online account and review the claim. If the claim is not correct, you will have a week to respond - you’ll be told how to do this when you review the claim in your account. If you do nothing, the claim will be submitted to OZEV as it is.

    If OZEV approves the claim, the grant will be paid to your chargepoint installer who will take the amount off your bill.

    Your invoice will show the total installation cost minus the grant amount.

    Audits

    In some cases, OZEV may choose to audit your installation to check it meets the grant requirements. If they do, OZEV will arrange for auditors to contact you for a site visit. If you do not allow a site visit, OZEV may withdraw your registration.

    Help with your application

    If you have any questions about the EV chargepoint grant or your grant applications.

    Phone

    0300 123 1343 Monday to Friday (excluding bank holidays), 9am to midday.

    Email

    If you are only installing chargepoints - landlordgrantenq@dvla.gov.uk

    If you are installing chargepoints and infrastructure - CarparkGrantenq@dvla.gov.uk

    Include your name in the email with the following details, if you have them:

    • your application reference number

    • your installer’s OZEV number

    British Sign Language (BSL) support

    You can get support using the British Sign Language (BSL) video relay service if you’re on a computer - watch a video about how to use the service on a mobile or tablet.

    Complaints

    You can email OZEV at chargepointfeedback@ozev.gov.uk to:

    • report an installer for misconduct

    • make a formal complaint about the scheme

    • report any issues with a chargepoint or an installer

    If you have an issue with a chargepoint or an installer, you should first try to resolve this with the installer. If you are not able to resolve the issue with after 10 working days you should email OZEV at chargepointfeedback@ozev.gov.uk.

    Technical support for grant portal

    If you have a technical problem using the portal, you can email OZEV_IT_issues@dvla.gov.uk

    We use cookies and similar technologies that are necessary to operate the website.Please read our cookie policy.

    We use cookies and similar technologies that are necessary to operate the website. Additional cookies are only used with your consent. We use the additional cookies to perform analyses of website usage and to check marketing measures for their efficiency. These analyses are carried out to provide you with a better user experience on the website. You are free to give, deny, or withdraw your consent at any time by using the "cookie settings" link at the bottom of each page. You can consent to our use of cookies by clicking "Agree". For more information about what information is collected and how it is shared with our partners, please read our cookie policy.

    • Required to run the website
    • Monitoring website usage and optimizing the user experience
    • Evaluation of marketing actions
    • Storage of your preferences from previous visits
    • Collecting user feedback to improve our website
    • Recording of your interests in order to provide customised content and offers
    Cookie Settings Accept